It is important to reflect on the As Built Drawings the following items: As part of QA procedures, it is imperative to maintain the log of Redline Markup and As-Built Drawings.Ĥ. Preparations of As Built Drawings shall be based on the approved Redline Markup Drawings.ģ. After the Redline Markup Drawing Setwas approved, Original Electronic files of Redline drawings shall be updated by Engineering Department/ Technical Team.Ģ. Once the review was completed and all the advance comments were addressed, the complete Redline Markup Drawing Set shall be officially submitted for approval by the Consultant.ġ. This helps avoid the repeated rejections experienced during the submission process.ģ. If necessary an advance review workshop shall be carried out on the prepared Redline Markup Drawings with the Consultant. The Redline Markup Drawings including records and evidence of all the changes and adjuncts noted on-site, including joint survey copy and other necessary information shall be prepared.Ģ. After the joint inspection was verified and approved by both parties, Redline Markup Drawings will be submitted.ġ. Once the IR was raised (including Contractor’s prepared Redline Drawing), joint inspection between Contractor QC team and Consultant team shall be carried out.Ģ.
#Septic as built drawing markings verification
After the above changes are noted by handwritten redlines on the controlled copy of shop drawings, IR (Inspection Request) for verification with the Consultant shall be raised by Construction Department.ġ.
The record drawings are then created using red-lines. The contractor will “ red line” the drawings showing the modifications at the end of the project. For example, structural drawings were made at the start of a new construction project. The words “red line” usually refer to the red pen used to mark changes to the drawings by hand. The “red-line” is being kept and updated by the Construction Team and the “As Built” submission where the reflected redline markup is being done by the Engineering Team or Technical Team designated by the contractor’s project organization.Ī red-line drawing is a form of intermediate drawing that reflects modifications or corrections to a previous drawing. This describes the process, roles and responsibilities, requirements, records to be maintained, and approval of redline drawings. The flowchart of Redline Markup and As Built Drawings shows how the redlines shall be prepared following the approval and implementation of each construction activity.